There will be a charge of $500.00 each time the installation crew arrives at job site location and G.C., Contractor or homeowner has approved the work done by others with A.E.L. complete and work is not complete according to the list above.
We are always available for consultation. Please call if there is a question or change in specifications needed!

SHOP DRAWINGS
WORK BY OTHERS
CONSTRUCTION REFERENCE CODE
1. Hoistway
2. 220 disconnect box.
3. Call station outlet
3-a 110V disconnect box
4. Solid core doors. Provide at each landing.
4-a Optional additional access door.
5. Hoistway finished with plywood or drywall. Square, plumb, clean and built to dimensions shown.
6. Threshold build out at each landing. Not less than 3/4' or more than 1- 1/2' to the cab.
7. Continuous 2" x 8" at center of each wall left to right of door opening (minimum height of 7' from last landing.)
8. Pump stand 2"x12"x20" pressure treated wood 48" to 58" high.
9. Equipment room shown adjacent to hoistway but may be located up to 20' away.
10. 1- ½" schedule 40 PVC run from hoistway below pit to equipment room. Stub as shown and cap both ends.
11. 110 volt electric outlet.
12. Hoistway, equipment room, floors, ceilings, etc as shown on drawing.

Hoistway Plan
Construction Reference Code
A. Lift control box
B. Call buttons (at each landing in hallway and cab interior)
C. Travel cable
D. Lift pump
E. Cab shoes
E-1 Cab guide rails
F. Aluminum cab framing (3"x3"x3/8" stock)
G. Lift cab walls (plywood ½" stock)
H. Accordion door (cab gate)
H-1 Accordion gate sensor
L. Ceiling grille
M. PVC cylinder
N. Push rod (plunger)
N-1 Aluminum plate secured to cab frame
O. Cylinder head
P. Reservoir tank